Things continue to progress as the bunkers on 4 and 5 take shape. Drainage installation began on 4 and will continue on Saturday. Final grading and prep work will also take place in anticipation of the first two loads of sod scheduled for Monday.
Old grass was stripped away from the 13th green's surrounds yesterday. Irrigation lines were adjusted and the contractor began grading both the left and right sides.
We will cut sod around the bunker on #6 green tomorrow and we hope to start grading that hole on Sunday. However, the area required for construction on #6 is much smaller in size and we will be able to leave that green open for play. The area where the sod is cut will be marked as ground under repair.
The grounds maintenance employees are holding up well but they have had a lot of long days in the hot sun. If you see any of the guys on the golf course, thank them for all the effort.
Arturo is putting a final edge on the right greenside bunker on #4
The left bunker on 5 is taking shape
Golf course Architect, Richard Mandell and shaper, Brian Ross discuss the right side of #5
Pedro is connecting irrigation wires on #13 green
Demo day has come for the bunker left of #13 green